Pune Ring Road Eastern Extension Approved

₹10,502 crore Cabinet nod fast-tracks Pune's eastern corridor and the homes rising along it.

Explore Now

Maharashtra Cabinet Clears ₹10,502 Crore Pune Ring Road Eastern Extension

Pune's long-awaited Ring Road project just moved several steps closer to reality. The Maharashtra Cabinet's Infrastructure Committee, chaired by Chief Minister Devendra Fadnavis, has approved the eastern extension of the Pune Ring Road at a revised project cost of ₹10,502.36 crore. The decision was taken at a meeting also attended by Deputy Chief Ministers Eknath Shinde and Sunetra Pawar, along with ministers Chandrashekhar Bawankule, Shivendraraje Bhosale and Uday Samant.

The approved stretch runs for roughly 33.8 km, connecting Sortapwadi on the Pune-Solapur Road to Varve-Shivare on the Pune-Satara Road. The Maharashtra State Road Development Corporation (MSRDC) will execute the project, which is planned for completion by June 2029. This eastern leg is part of the larger 168.89 km Pune Ring Road, and once the full loop is connected, inter-state and long-distance traffic travelling across different parts of the state will finally be able to bypass Pune city altogether.

Engineering-wise, this isn't a simple widening job. The corridor will feature one major traffic interchange, three major bridges, five minor bridges, 18 elevated road sections or flyovers, and four tunnels. Officials have also planned tree plantation along both sides of the alignment, with landscaping and beautification work concentrated near the interchange. The controlled-access expressway is designed for a speed of 120 kmph, which puts it in the same league as Pune's newer expressway-grade infrastructure.

Land acquisition, often the biggest bottleneck for road projects in Maharashtra, is already well underway. About 80 per cent of the land required for this stretch has been acquired, which is a strong signal that construction could begin on schedule rather than getting stuck in litigation or compensation disputes for years, as has happened with several other ring road segments across the state.

For homebuyers and investors, the significance goes beyond just easier commutes. Ring roads of this scale typically trigger a wave of residential and logistics development around their interchanges and access points, simply because land along a controlled-access corridor becomes dramatically more connected almost overnight. Pune's eastern belt, stretching toward Solapur Road and Satara Road, has traditionally lagged behind the IT-heavy western and northern suburbs in terms of infrastructure attention. This approval changes that equation.

It's also worth noting the timing. This clearance came alongside a separate ₹17,725 crore approval for Mumbai's Metro Line 13 connecting Mira-Bhayander with Vasai-Virar, suggesting the state government is currently in an aggressive infrastructure-spending cycle across both the MMR and Pune Metropolitan Region. For a city that has struggled with traffic bottlenecks for over a decade, having the funding and land acquisition largely sorted is a meaningfully different starting point than previous ring road announcements.

That said, a Cabinet approval is not the same as a shovel-in-the-ground start date, and June 2029 is still roughly three years out. Homebuyers evaluating projects near this corridor should track actual construction milestones, not just the announcement, before pricing in the connectivity premium. Early movers who buy ahead of physical construction typically get better entry prices, but the flip side is that timelines on large infrastructure projects in India routinely slip.

For now, the ₹10,502 crore clearance is a clear statement of intent from the state government, and it puts Pune's eastern suburbs firmly on the radar for the next real estate growth cycle. Anyone tracking Pune real estate over the next three to five years would do well to watch how quickly ground-level work follows this approval.

Narrative

SMART WORLD Projects

SMART WORLD Moshi
Upcoming

SMART WORLD Moshi

Moshi, Pune

2, 3 BHK • Price on Request

Smart World's North Pune debut

Smart World Shewalwadi
Upcoming

Smart World Shewalwadi

Shewalwadi, Pune

2, 3 BHK • Price on Request

Upcoming high-rise homes in East Pune

Smart World Hinjewadi Phase 3
Pre-Launch

Smart World Hinjewadi Phase 3

Hinjewadi Phase 3, Pune

2, 3 BHK • Price on request

Resort-style living in Pune's IT corridor

Smart World Pune
Pre-Launch

Smart World Pune

Talegaon-Chakan Belt, Pune

2, 3 BHK • Price on Request

1 km riverside promenade & golf-inspired greens

Smart World Pune - Hinjewadi Corridor
Pre-Launch

Smart World Pune - Hinjewadi Corridor

Hinjewadi, Pune

2, 3 BHK • Price on Request

Golf-course-facing homes on NH48

Smart World Pune - Wakad
Pre-Launch

Smart World Pune - Wakad

Wakad, Pune

2, 3 BHK • Price on Request

Riverside homes with golf-inspired greens

Smart World Sector 111 Floors
Pre-Launch

Smart World Sector 111 Floors

Sector 111, Dwarka Expressway, Gurugram

2.5, 3.5 BHK • Price on Request

Low-rise floors on Dwarka Expressway

Smart World Sector 128
Pre-Launch

Smart World Sector 128

Sector 128, Noida

3, 4 BHK • Price on Request

73-acre pre-launch on Noida Expressway

Book a Visit

Schedule Your Visit

Back

Quick Answers

What exactly was approved for the Pune Ring Road?
The Maharashtra Cabinet's Infrastructure Committee approved the eastern extension of the Pune Ring Road at a revised cost of ₹10,502.36 crore. This covers a roughly 33.8 km stretch from Sortapwadi on the Pune-Solapur Road to Varve-Shivare on the Pune-Satara Road.
Who is building the Pune Ring Road eastern extension?
The Maharashtra State Road Development Corporation (MSRDC) will undertake construction and implementation of the project.
When is the eastern extension expected to be completed?
The project is planned for completion by June 2029, according to the approved timeline.
How much land has been acquired so far?
Around 80 per cent of the land acquisition required for this stretch has already been completed, which reduces the risk of major delays.
What structures will the eastern extension include?
The corridor will have one traffic interchange, three major bridges, five minor bridges, 18 elevated road sections or flyovers, and four tunnels, along with tree plantation and landscaping near the interchange.
How does this connect to the full Pune Ring Road?
This eastern stretch is one segment of the larger 168.89 km Pune Ring Road. Once the entire loop is completed and connected, inter-city and inter-state traffic will be able to bypass Pune city entirely.
Why does this matter for homebuyers in Pune?
Ring road corridors typically unlock faster connectivity and spur residential, commercial and logistics development around interchanges, making previously overlooked pockets more attractive for both end-use and investment.
What is the design speed of the new corridor?
The controlled-access expressway is designed for a speed of 120 kmph, putting it on par with modern expressway-grade infrastructure.
Was any other major project approved alongside this one?
Yes, the same Cabinet Infrastructure Committee meeting also cleared Mumbai's Metro Line 13 between Mira-Bhayander and Vasai-Virar at an estimated cost of ₹17,724.99 crore.
Should I buy property near the ring road corridor now?
With land acquisition largely done and funding approved, the risk profile is lower than a typical announcement-stage project, but buyers should still track actual construction progress before pricing in the full connectivity premium.

For information only — this is not an offer and creates no obligation. Prices, layouts, and photos are indicative and can change anytime. Do your own verification before making a decision. About · Projects