Pune Metro Line 4: Hadapsar-Kharadi Corridor Update

Approved Kharadi-Hadapsar-Swargate-Khadakwasla metro corridor set to redefine East Pune connectivity.

Explore Now

Pune Metro's Kharadi-Hadapsar Corridor Clears Final Hurdle

Pune's eastern and southern suburbs are edging closer to a major public transport upgrade. The Union Cabinet, chaired by Prime Minister Narendra Modi, approved Line 4 (Kharadi–Hadapsar–Swargate–Khadakwasla) and its spur Line 4A (Nal Stop–Warje–Manik Baug) under Phase-2 of the Pune Metro Rail Project on 26 November 2025, marking the second major Phase-2 sanction after the Vanaz–Chandani Chowk and Ramwadi–Wagholi lines. Together, the two corridors span 31.636 km with 28 elevated stations, connecting IT hubs, commercial zones, educational institutions, and residential clusters across East, South, and West Pune.

The project carries an estimated cost of Rs 9,857.85 crore, to be jointly funded by the Government of India, the Government of Maharashtra, and external bilateral or multilateral funding agencies, with a five-year construction timeline from the date of approval. Following the Centre's clearance, the Maharashtra government issued a revised administrative approval on 17 February 2026 via a Government Resolution authorising a Memorandum of Understanding between the state, the Union government, and Maha Metro, which will execute the project. Under the funding structure, both the Union and state governments will contribute Rs 1,212 crore each, with the balance met through loans and other sources.

For Hadapsar and Kharadi residents, the biggest draw is the interchange planned at Hadapsar Railway Station, which will also connect with future corridors towards Loni Kalbhor and Saswad Road, ensuring multimodal connectivity across metro, rail, and bus networks. In fact, the state separately cleared two additional spur lines — Hadapsar to Loni Kalbhor and Hadapsar to Saswad Road — covering about 16 km and 14 elevated stations, reinforcing Hadapsar's emergence as a key transit node in the city's east.

The corridor threads through some of Pune's busiest arterial stretches, including Solapur Road, Magarpatta Road, Sinhagad Road, Karve Road, and the Mumbai–Bengaluru Highway, and is expected to meaningfully ease congestion on these routes while improving safety and encouraging a shift towards greener commuting. Officials note that the Kharadi–Khadakwasla stretch, linking the IT corridor with the southwestern residential belt, is projected to carry the highest ridership on the line, effectively becoming Pune's first continuous east-west and southwest rapid transit spine.

Ridership projections underline the scale of demand this corridor is expected to serve: daily ridership on Line 4 and 4A combined is expected to be 4.09 lakh in 2028, rising to nearly 7 lakh by 2038. On the ground, momentum is visible — MLA Bhimrao Tapkir recently walked the proposed alignment with Maha-Metro Managing Director Shravan Hardikar and senior officials, inspecting station locations and neighbourhood nodes such as the Khadakwasla Gaothan area. Maha Metro is currently finalising station locations, ramp designs, and minor alignment adjustments, with the tendering process for construction agencies likely to begin in the coming months.

For homebuyers evaluating East Pune, this update matters beyond headlines. Kharadi already anchors one of the city's largest IT employment clusters, while Hadapsar's mix of established townships and ongoing redevelopment has kept it on buyer radars for years. A confirmed, funded metro line — rather than a proposal on paper — tends to shift buyer sentiment meaningfully, as it de-risks the long-term commute and infrastructure story for a locality. With cost breakups already worked out (Rs 1,694 crore for alignment and formation works, Rs 1,300 crore for stations, and about Rs 890 crore for traction, power, and signalling), the project has moved well past the conceptual stage.

As Pune's metro network is set to extend beyond 100 km with this approval, developers with a presence in the city are watching the Hadapsar-Kharadi belt closely. Smart World, known for its master-planned residential developments in Gurugram, has signalled plans to expand its footprint to cities including Pune, and infrastructure catalysts like this metro corridor are exactly the kind of long-term connectivity story that shapes where such developments get planned next.

Narrative

SMART WORLD Projects

Smart World Sector 111 Floors
Pre-Launch

Smart World Sector 111 Floors

Sector 111, Dwarka Expressway, Gurugram

2.5, 3.5 BHK • Price on Request

Low-rise floors on Dwarka Expressway

Smart World Sector 128
Pre-Launch

Smart World Sector 128

Sector 128, Noida

3, 4 BHK • Price on Request

73-acre pre-launch on Noida Expressway

Smart World Sector 62
Pre-Launch

Smart World Sector 62

Sector 62, Golf Course Extension Road, Gurugram

2.5, 3 BHK • Rs 3.30 Cr onwards

Upcoming luxury launch off Golf Course Extension Road

Smart World Sector 94 Noida
Pre-Launch

Smart World Sector 94 Noida

Sector 94, Noida

2, 3, 4 BHK • Price on Request

Pre-launch high-rise on Noida Expressway

Smart World Sector 96 Noida
Pre-Launch

Smart World Sector 96 Noida

Sector 96, Noida

3, 4 BHK • Rs 3.50 Cr onwards

Upcoming expressway-facing luxury towers

Smart World Sector 97
Pre-Launch

Smart World Sector 97

Sector 97, Noida

3, 4 BHK • Price on request

6-acre expressway-facing luxury address

Smartworld Orchard Street, Sector 69, Gurugram
Pre-Launch

Smartworld Orchard Street, Sector 69, Gurugram

Sector 69, Gurugram

3, 4 BHK • Price on Request

ELIE SAAB signature branded residences

Smartworld Wellness Residences (Sector 67A)
Pre-Launch

Smartworld Wellness Residences (Sector 67A)

Sector 67A, Gurgaon

2, 3 BHK • Rs 2.40 Cr onwards

6-acre pre-launch development

Book a Visit

Schedule Your Visit

Back

Quick Answers

What is Pune Metro Line 4 (previously referred to as Line 5)?
It is an approved elevated metro corridor connecting Kharadi–Hadapsar–Swargate–Khadakwasla over 25.52 km, along with a spur Line 4A from Nal Stop–Warje–Manik Baug. Together the two lines span 31.64 km with 28 stations.
Has this metro line been officially approved?
Yes. The Union Cabinet approved the corridor on 26 November 2025, and the Maharashtra government issued revised administrative approval on 17 February 2026, clearing the way for a formal MoU and execution by Maha Metro.
What is the total cost of the project?
The project is estimated to cost Rs 9,857.85 crore, jointly funded by the Government of India, the Government of Maharashtra, and external funding agencies, with the Centre and state each contributing Rs 1,212 crore.
When will the metro line be completed?
The project is expected to be completed within five years from the date of approval. Tendering for construction agencies is likely to begin in the coming months, with preliminary station and alignment work already underway.
Which areas will benefit most from this corridor?
Kharadi's IT hub, Hadapsar's industrial and residential belt, Swargate, and Khadakwasla will see the most direct connectivity gains, along with congestion relief on Solapur Road, Magarpatta Road, Sinhagad Road, and Karve Road.
Will there be an interchange at Hadapsar?
Yes, the line provides an interchange at Hadapsar Railway Station and will connect with future planned corridors towards Loni Kalbhor and Saswad Road, strengthening multimodal connectivity in East Pune.
How will this affect property prices in Hadapsar and Kharadi?
Confirmed, funded metro infrastructure typically improves long-term buyer confidence in a locality's connectivity story, which can support steadier appreciation over the project's construction and post-launch phases.
Is Smart World planning any project near this corridor?
Smart World has publicly stated plans to expand beyond Gurugram into cities including Pune, Mumbai, and Bengaluru, though specific site details for a Pune project are yet to be formally announced.
What is the expected ridership on this line?
Daily ridership on Line 4 and 4A combined is projected at 4.09 lakh by 2028, rising to nearly 7 lakh by 2038 as the corridor matures and surrounding development intensifies.
Where can I track construction progress on this metro line?
Updates are typically shared by Maha Metro, PMRDA, and covered by local Pune news outlets as tendering, station finalisation, and construction milestones progress over the coming months.

For information only — this is not an offer and creates no obligation. Prices, layouts, and photos are indicative and can change anytime. Do your own verification before making a decision. About · Projects