Metro Line 9 Phase 1: Thane's Game-Changing Connectivity

Mira-Bhayandar gets first metro. 30-minute commute to Mumbai. Prices surge.

Explore Now

Mumbai Metro Line 9 Phase 1 Now Operational: What It Means for Real Estate and Commuters

On April 7, 2026, the Red Line was extended northward into Mira-Bhayandar with the opening of Phase 1 of Line 9, with commercial services beginning on April 8, 2026. This marks a watershed moment for Thane district—for the first time, residents have direct metro access to Mumbai.

The newly operational section spans 5.6 km and includes four stations—Dahisar East, Pandurangwadi, Miragaon, and Kashigaon, forming a crucial link in the broader Mumbai Metropolitan Region transit network. Metro Line-9 is part of Mumbai's pioneering double-decker infrastructure project, where both metro and vehicular flyovers share a common viaduct.

The impact on commute times is dramatic. The Metro Line 9 project is expected to significantly reduce travel time between Mira-Bhayandar and key parts of Mumbai, bringing down commute durations from one to two hours to nearly 30 minutes. For commuters from Mira-Bhayandar, this is the first direct metro link into Mumbai, an alternative to the grinding daily slog on the Western Express Highway.

Real estate markets are already responding. Areas with operational metro stations have already witnessed a 15-20% increase in property prices. Neighbourhoods within 1 km of metro stations are witnessing the highest growth. Analysts project steady appreciation ahead—based on trends from earlier Mumbai metro corridors, analysts expect annual property appreciation of 8–10% in Mira Road and Bhayandar over the next five to seven years.

Metro Line-9 will transform travel for Mira-Bhayandar residents by connecting directly to CSMIA Airport via Lines 7, 7A, Andheri (West) via Line 2B, Ghatkopar via Lines 7 and 1, and Link Road through Metro Line-2A at Dahisar (East). Dahisar East is now a three-line interchange, where passengers can transfer between all three lines at concourse level without exiting the paid area.

The corridor's environmental and traffic impact is measurable. Metro Line 9 offers an estimated reduction of over 1.5 lakh vehicular trips daily along the Dahisar-Mira Bhayandar stretch. Rental demand from working professionals employed in commercial hubs such as Malad Mindspace, NESCO IT Park and Andheri MIDC has pushed rental yields in Mira Road up to 4%.

With Phase 2 under development and a 31 km complete corridor planned, this infrastructure milestone is reshaping not just commute patterns but the entire real estate trajectory of northern Mumbai's suburbs.

Narrative

SMART WORLD Projects

Smart World Sector 111 Floors
Pre-Launch

Smart World Sector 111 Floors

Sector 111, Dwarka Expressway, Gurugram

2.5, 3.5 BHK • Price on Request

Low-rise floors on Dwarka Expressway

Smart World Sector 128
Pre-Launch

Smart World Sector 128

Sector 128, Noida

3, 4 BHK • Price on Request

73-acre pre-launch on Noida Expressway

Smart World Sector 62
Pre-Launch

Smart World Sector 62

Sector 62, Golf Course Extension Road, Gurugram

2.5, 3 BHK • Rs 3.30 Cr onwards

Upcoming luxury launch off Golf Course Extension Road

Smart World Sector 94 Noida
Pre-Launch

Smart World Sector 94 Noida

Sector 94, Noida

2, 3, 4 BHK • Price on Request

Pre-launch high-rise on Noida Expressway

Smart World Sector 96 Noida
Pre-Launch

Smart World Sector 96 Noida

Sector 96, Noida

3, 4 BHK • Rs 3.50 Cr onwards

Upcoming expressway-facing luxury towers

Smart World Sector 97
Pre-Launch

Smart World Sector 97

Sector 97, Noida

3, 4 BHK • Price on request

6-acre expressway-facing luxury address

Smartworld Orchard Street, Sector 69, Gurugram
Pre-Launch

Smartworld Orchard Street, Sector 69, Gurugram

Sector 69, Gurugram

3, 4 BHK • Price on Request

ELIE SAAB signature branded residences

Smartworld Wellness Residences (Sector 67A)
Pre-Launch

Smartworld Wellness Residences (Sector 67A)

Sector 67A, Gurgaon

2, 3 BHK • Rs 2.40 Cr onwards

6-acre pre-launch development

Book a Visit

Schedule Your Visit

Back

Quick Answers

When did Metro Line 9 Phase 1 open?
Phase 1 opened on April 7, 2026, with commercial services commencing on April 8, 2026.
Which stations are operational on Line 9 Phase 1?
Stations opened in this phase are Dahisar East (interchange with Metro Line 2A), Pandurang Wadi, Miragaon (interchange with approved Metro Line 10), and Kashigaon.
How far is Phase 1 and what does it cover?
The newly operational section spans 5.6 km and includes four stations forming a crucial link in the broader Mumbai Metropolitan Region transit network.
What is the travel time from Mira-Bhayandar to Mumbai now?
The Metro Line 9 project is expected to significantly reduce travel time between Mira-Bhayandar and key parts of Mumbai, bringing down commute durations from one to two hours to nearly 30 minutes.
How has property value changed since the metro opened?
Areas with operational metro stations have already witnessed a 15-20% increase in property prices. Neighbourhoods within 1 km of metro stations are witnessing the highest growth.
What is the double-decker infrastructure mentioned?
Metro Line-9 is part of Mumbai's pioneering double-decker infrastructure project, where both metro and vehicular flyovers share a common viaduct.
Which metro lines connect to Line 9?
Dahisar East is now a three-line interchange where passengers can transfer between all three lines at concourse level without exiting the paid area or passing through additional security checks.
What is the environmental impact of Metro Line 9?
Metro Line 9 offers an estimated reduction of over 1.5 lakh vehicular trips daily along the Dahisar-Mira Bhayandar stretch and provides an alternative route for overcrowding on the Western Railway suburban line.
What future phases are planned?
With Phase 2 nearing completion, real estate properties and enterprises see steep growth in investment values.
Is Mira Road still affordable compared to other suburbs?
Current market comparisons show that Mira Road properties continue to remain approximately 30–35% more affordable than Borivali.

For information only — this is not an offer and creates no obligation. Prices, layouts, and photos are indicative and can change anytime. Do your own verification before making a decision. About · Projects